Artuklu is a district of Mardin province with an area of about 859 km². It is in investment incentive region 6. The district has 2 organised industrial zones. This page summarises the environmental plan covering the district and recent changes on its map sheets, zoning plans on public display, the municipality's e-İmar links and title deed transaction counts.
Artuklu in orange. Hover over or tap the districts to see their names; click to open a district page. Boundaries are simplified.
Incentive region?
In short: The region (1 to 6) into which the state groups provinces by level of development for investment incentives. The higher the number, the greater the support (tax reductions, social security premium support, interest support and so on); region 6 gets the most. It sets the scope of incentives when you choose an investment location.
Region 61 (most developed) – 6
Area859 km²
Organised industrial zones?
In short: A planned area where factories are built together, with roads, electricity, water, natural gas and waste water treatment already in place. Industrial plots are usually allocated or sold by the OIZ management.
2
Sales (2025)?
In short: Transaction counts in the district from the 2025 property analysis data of the General Directorate of Land Registry and Cadastre (TKGM). A "main property" is the land itself (plot, field); an "independent unit" is a flat, shop and so on. The numbers are totals only and contain no prices.
In short: An upper-level plan at 1:100,000 scale that shows land-use decisions such as agriculture, forest, urban development, industry and tourism. It does not directly show a parcel's building rights (floor area ratio, number of storeys); for that, see the municipality's zoning plan and the zoning status certificate.
Mardin-Batman-Siirt-Şırnak-Hakkari Environmental Plan
1:100,000 environmental plan · 36 plan changes in total · last record 26.01.2026
Artuklu is on these map sheets ?
In short: A printed sheet of the plan. In the environmental plan each sheet covers a square of roughly 50 × 55 km; changes are announced sheet by sheet.
Plan hükümlerine yönelik düzenlemeler Plan provisions · whole plandocument
Kentsel Servis Alanı Plan change · sheet N46document
plan hükmüne yönelik düzenlemeler Plan provisions · whole plandocument
Kentsel Servis Alanı Plan change · sheet N46document
Kentsel Servis Alanı Plan change · sheet N45document
plan hükmüne yönelik düzenlemeler Plan provisions · whole plandocument
Zoning plans on public display ?
In short: After new or amended zoning plans are approved, they are put on public display for 30 days. During this period anyone can inspect the plan and object to it.
There are currently no zoning plans shown as on public display in e-Plan for the Artuklu district.
Source: Ministry of Environment, Urbanisation and Climate Change e-Plan system · last checked 29 September 2026. Plans are found by intersecting the plan boundary with the district boundary; for details and the objection period, see the plan's e-Plan page.
Zoning status lookup ?
In short: The exact building rights of a parcel are in the municipality's zoning plan. They can be looked up by block/parcel on the municipality's e-İmar pages; for official purposes, get a zoning status certificate (imar durumu belgesi) from the municipality.
When you select your parcel on the map, these links are shown automatically for the relevant municipality.
Industrial and investment zones
Organised industrial zones (2) ?
In short: A planned area where factories are built together, with roads, electricity, water, natural gas and waste water treatment already in place. Industrial plots are usually allocated or sold by the OIZ management.
To the railway line6.1 kma line crosses the district
Distances are straight-line and measured from a representative point in the middle of the district; road distances are longer. Source: Ministry of Industry and Technology (MEYDİP) transport layers; the airport list was updated in 2026 to airports with scheduled passenger flights.
Nearby amenities ?
In short: The number of schools, health facilities, supermarkets, parks and service points recorded within this boundary in OpenStreetMap (the open world map kept up to date by volunteers). Coverage is good in cities; rural areas may have gaps. The distance from a parcel to the nearest amenities is shown on the map.
School49
Nursery / kindergarten4
University2
Hospital3
Health centre10
Pharmacy56
Supermarket42
Street market8
Park39
Mosque95
Fuel station32
Bus station3
Police / gendarmerie4
Fire station1
Post office (PTT)4
Bank / ATM25
Points recorded in OpenStreetMap within the Artuklu district. The distance from a parcel to the nearest school, supermarket, health centre and park, and a liveability score, are shown on the map when you select a parcel.
In short: Fault traces come from the GEM Global Active Faults Database (EMME compilation for the Middle East, SHARE for Europe) and earthquakes from the United States Geological Survey (USGS) catalogue. "Slip rate" is how far the two sides of a fault move relative to each other each year; the faster it is, the more often the fault produces earthquakes. For the official earthquake hazard see AFAD's Turkey Earthquake Hazard Map; for a parcel, a soil survey is essential.
M5+ earthquakes (since 1900)0within the district or 10 km of it
Fault traces crossing the boundary0no major fault zone
No earthquakes of magnitude 5 or above have been recorded within the Artuklu district or 10 km of it since 1900. The distance from your parcel to the nearest fault, the fault type and nearby earthquakes are shown on the map when you select a parcel.
The whole of Türkiye is an earthquake zone. Source: GEM Global Active Faults Database (CC BY-SA 4.0), USGS earthquake catalogue. For the official earthquake hazard see AFAD's Turkey Earthquake Hazard Map, for active faults the MTA Earth Sciences Portal; for any building, a soil survey is essential.
Title deed transactions (TKGM 2025) ?
In short: Transaction counts in the district from the 2025 property analysis data of the General Directorate of Land Registry and Cadastre (TKGM). A "main property" is the land itself (plot, field); an "independent unit" is a flat, shop and so on. The numbers are totals only and contain no prices.
Sales4,806722 different parcels
Main property sales547458 different parcels
Main property sales with mortgage—
Independent unit sales with mortgage253113 different parcels
Source: TKGM property analysis 2025. Activity around a parcel (250 m – 1 km) is shown on the map when you select a parcel.
State land sales ?
In short: The sale by tender of treasury-owned property by the General Directorate of National Property (Milli Emlak). Notices are published on the ministry's official website; the notice sets out the conditions for taking part.
There are currently 12 open state land sale notices in the Artuklu district. Those with the nearest tender dates:
Source: General Directorate of National Property (Milli Emlak) sale notices. The official notice page prevails for the conditions of taking part and definitive information.
In the ParselX map's Parcel tab, choose Mardin and Artuklu, then enter the neighbourhood, block and parcel number, or tap the parcel on the map. The TKGM parcel boundary, area and land use are shown together with the plan decision, e-Plan zoning plans and municipality links.
Where can I see the zoning plan for Artuklu?
The exact building rights are in the Artuklu Municipality's zoning plan; you can look them up by block/parcel on the municipality's e-İmar page. Plans in force and on public display are also published in the Ministry's e-Plan system; the ParselX parcel screen lists the plans that intersect the parcel.
Which environmental plan covers Artuklu?
Artuklu falls under the Mardin-Batman-Siirt-Şırnak-Hakkari Environmental Plan (map sheets M45, N45, N46). Recent plan changes on the district's map sheets are listed on this page.
Which investment incentive region is Artuklu in?
Artuklu (Mardin) is in region 6 of the investment incentive system.
Which airport is nearest to Artuklu?
Mardin Airport; about 14.3 km as the crow flies from the middle of the district. The nearest port is Van Port (about 260.6 km).
Are there zoning plans on public display in Artuklu?
At the last check, no zoning plan on public display intersecting Artuklu was shown in e-Plan.
Is Artuklu in an earthquake zone?
The whole of Türkiye is an earthquake zone. No earthquakes of magnitude 5 or above have been recorded within the Artuklu district or 10 km of it since 1900. The distance from a parcel to the nearest active fault is shown on the ParselX map; for the official hazard value see AFAD's Turkey Earthquake Hazard Map.
Look up parcels in Artuklu
Find the TKGM parcel by block/parcel number or by tapping the map; plan decisions, distances, slope, solar potential and zoning status links on one screen.
Sources: TKGM administrative boundaries and 2025 property analysis; Ministry of Industry and Technology (MEYDİP) organised industrial zone, technology development zone, industrial zone and incentive data; Ministry of Environment, Urbanisation and Climate Change (MPGM environmental plans, e-Plan); National Property (Milli Emlak) notices. Region data compiled on 29 September 2026. This page is for information only; for official transactions the documents of the relevant institutions prevail.