Farm structures on agricultural land · Crop production

Sapling production facility

Criteria in the regulation

In short: In a sapling facility, building areas depend on production capacity: set square metres for every 1,000 saplings.

Permit route

Zoning rules

Interpretation note

The text says the facility "must have" these areas; it does not say whether they are minimums or maximums. There is no minimum land requirement.

Select your parcel on the map and open "Building on agricultural land › Building types" to calculate this structure's limits with your parcel's data.

Select your parcel on the map

Legal basis: Annex 1 Art. 4.2 · Regulation on the Protection and Use of Agricultural Land (RG 04.04.2026/33214). The criteria in Annex 1 of the Regulation can also be updated by the General Directorate of Agrarian Reform outside the Official Gazette; confirm the current criteria with the provincial directorate of agriculture and forestry before applying.

Other structures in the same group

All building types