Sapling production facility
Criteria in the regulation
In short: In a sapling facility, building areas depend on production capacity: set square metres for every 1,000 saplings.
Permit route
- Outside a large plain protection area: the provincial directorate of agriculture and forestry reviews the application and the governor's office grants permission; the land class does not matter, no alternative site is required and the Soil Conservation Board is not involved.
- In a large plain protection area: the Ministry grants permission provided there is no alternative site and the Board gives a favourable opinion; an alternative site is looked for first on your land outside the protection area and in specialised agricultural organised industrial zones (OIZs) in the district.
Zoning rules
- In areas without a zoning plan: FAR 0.4 for all buildings on the parcel, height 7.5 m and 2 storeys; setbacks of 10 m from the road and 5 m from the parcel boundary (Zoning Regulation for Unplanned Areas, art. 63).
- It is assumed that this structure will be treated as one of the farm structures listed in that article.
- If the parcel is covered by an approved environmental plan or zoning plan, the plan's provisions apply first.
Interpretation note
The text says the facility "must have" these areas; it does not say whether they are minimums or maximums. There is no minimum land requirement.
Select your parcel on the map and open "Building on agricultural land › Building types" to calculate this structure's limits with your parcel's data.
Legal basis: Annex 1 Art. 4.2 · Regulation on the Protection and Use of Agricultural Land (RG 04.04.2026/33214). The criteria in Annex 1 of the Regulation can also be updated by the General Directorate of Agrarian Reform outside the Official Gazette; confirm the current criteria with the provincial directorate of agriculture and forestry before applying.